PREQUALIFICATION ANNOUNCEMENT
No. 001/SPL-SPM/RDMP-RP/2017
Bidding of Engineering, Procurement and Construction (“EPC”)
Submarine Pipe Line (“SPL”) &Single Point Mooring (“SPM”) and Facilities for Refinery Development Master Plan (“RDMP”) Project of Refinery Unit (“RU”) V Balikpapan
PT Pertamina (Persero) will hold Prequalification (“PQ”) in accordance with SK Direksi Pertamina No. Kpts-043/C00000/2015-S0 dated 8th October 2015 and/or its amendment of Sistem & Tata Kerja Pengadaan Barang/Jasa at PT Pertamina (Persero), as follows :
I. Project Informations :
- Procurement and installation of SPM Calm Buoy system with capacity 320.000 DWT with depth 32 m including PLEM,
- Procurement and installation of SPL:
- 60 inch (including 4 inch concrete coated) with length ±14 km
- 23,14 inch (including 40mm concrete coated) with length ±4,5 km
- Procurement and installation of onshore pipe line:
- 52 inch with length ±7 km
- 20 inch with length ±14 km
- Corrosion protection system and pigging facility
- Procurement and construction for onshore facilities:
- 2 (two) crude oil tank with capacity @ 1 million barrel
- 2 (two) crude transfer pump with capacity 665 m3/h
- Raw Water Unit consists of: 3 water deep well capacity 40m3/h, Aerator, Holding Tank, Chemical System, Sand Filter.
- Demineralizer Water Unit consists of Softener unit with capacity 7m3/h & Polisher Unit
- Steam & Power Generation Unit: Gas Turbine Generator & HRSG
- Instrument Air & Plant Air unit
- Fire Water System & WWTP Unit
II. PQ Participant
Companies to participate in PQ shall form Consortium that shall meet requirements set out in PQ Document with the following structure and requirements:
Position |
Administrative |
Audited Financial Performance 2016 |
Technical1) |
|
Net Worth Eqv. USD |
Financial Health Score |
|||
Leader (mandatory) |
Overseas:
|
Minimum 75 Million |
Minimum “60” |
Having project experiences within 15 years since 2001 for EPC SPL & SPM Installation:
|
Domestic / National:
|
Position |
Administrative |
Audited Financial Performance 2016 |
Technical1 |
|
Net Worth Eqv. USD |
Financial Health Score |
|||
Domestic2) member (mandatory) |
|
Minimum 15 Million |
Minimum “60” |
Having project experiences within 15 years since 2001 for EPC in Oil & Gas / Petrochemical project with contract value min. USD 15,000,000. |
National3) member (optional) |
||||
Overseas member 1 (mandatory) |
|
Minimum 75 Million |
Minimum “60” |
Having project experience within 15 years since 2001 for EPC Crude Oil Tank Project with capacity min. 1 million barrel per tank |
Overseas member 2 (mandatory) |
|
Minimum 75 Million |
Minimum “60” |
Having owned laybarge4) with min. spec.:
|
Note :
Detail requirements of administration, financial and technical set out in PQ document :
III. PQ Process Stage
No. |
Activity |
Schedule |
Description |
Document Required Comply to Point II |
1. |
Registration |
20, 21, 25, 26 April 2017 Time: 08.00 AM – 11.30 AM & 01.00 PM – 04.00 PM |
Performed by single company. |
|
2. |
PQ Explanation |
Thursday, 27 April 2017 Time: 09.00 AM - finish |
Attended by companies who have received PQ document. |
Original PQ Document. |
3. |
PQ Response Submission |
Will be discussed during PQ explanation |
- |
PQ document response prepared in accordance with PQ requirements |
Note:
*) Statement letter signed by Director of the Company that stating :
BID COMMITTEE OF RDMP PROJECT - RU V BALIKPAPAN
PT PERTAMINA (PERSERO)