PRE-QUALIFICATION ANNOUNCEMENT
Bidding of Engineering, Procurement and Construction (“EPC”)
Lawe-Lawe Facilities RDMP RU V-Balikpapan
No. 003/EPC-LAWE2/RDMP-RUV/2018
PT Pertamina (Persero) will hold Pre-qualification (PQ), in accordance with SK Direksi Pertamina No. Kpts-043/C00000/2015-S0 dated 8th October 2015 and/or its amendment of Sistem & Tata Kerja Pengadaan Barang/Jasa at PT Pertamina (Persero), as follows:
I. PROJECT INFORMATIONS :
EPC for the following process unit / facilities:
1. Unloading crude facilities:
a. Single Point Mooring System & PLEM – 320,000 DWT
b. 52” OD Pipeline (Offshore from PLEM to Tanjung Jumlai & onshore pipeline Tanjung Jumlai to Pig receiver facility)
2. Onshore facilities:
3. Transfer Line facility:
20 inch pipeline (Onshore from Lawe-Lawe terminal to Panajam terminal include pigging system and offshore from Panajam terminal to Balikpapan refinery include pigging system)
II. PQ PARTICIPANT :
Companies who intent to participate in PQ shall form Consortium or Joint Operation (JO). Consortium or Joint Operation shall appoint one of members as the Leader of Consortium / JO and at least 1 (one) Domestic Company as member. Consortium / JO shall have experiences:
that shall meet requirements set out in PQ Document which the following:
Position |
Administrative |
Health, Safety Environment (“HSE”) |
Technical1 |
Financial Performance 20172 |
|
Net Worth Eqv. USD |
Financial Health Score |
||||
Leader (mandatory) |
Overseas: · Permit of Representative or National / Domestic: · SBU (Sertifikat Badan Usaha) integrated construction services – Oil & Gas Facilities with “B” qualification · IUJK (Izin Usaha Jasa Konstruksi) with “B” qualification · SKT MIGAS (Surat Keterangan Terdaftar Minyak & Gas) – Process Industry |
· Pertamina Contractor Safety Management System (CSMS) Certificate with “High Grade” qualification · For Company who does not have CSMS, shall submit similar HSE certificate |
Having project experiences outside Company’s home country* as leader of consortium or single contractor within 15 years since 2002 for EPC installation: · SPL with OD = min. 32 inch, length = min. 10 km, depth = min. 20 m; and · SPM or mooring tower system with capacity min. 250,000 DWT; and Having owned or supporting letter from owner of barge5) with min. spec.: · Tensioner capacity 120 MT min. number of tensioner is 2 Ea. · Tensioner Pipe size capacity min. 60” OD (including coating) · Mooring system 8-pt anchors · Crane capacity min. 250 MT
*except for domestic or national company |
Minimum 100 Million |
Minimum “40” |
Domestic3 member (mandatory/optional)6 |
· SBU integrated construction services – Oil & Gas Facilities with “B” qualification · IUJK with “B” qualification · SKT MIGAS – Industrial Process |
· Pertamina Contractor Safety Management System (CSMS) Certificate with “High Grade” qualification · For Company who does not have CSMS, shall submit similar HSE certificate |
Having project experiences within 15 years since 2002, for EPC industry Oil & Gas Process Plant / industry Petrochemical Plant / industry Power Plant project as leader of consortium or single contractor with contract value min. USD 15,000,000; or
Having project experience within 15 years since 2002 for EPC Crude or product (premium or diesel or kerosene or avtur) or LPG or LNG Tankage Project with capacity min. 600 MB per tank.
|
Minimum 15 Million |
Minimum “40” |
National4 member (optional) |
|||||
Overseas member 7)
|
Overseas: · Permit of Representative
|
· Pertamina Contractor Safety Management System (CSMS) Certificate with “High Grade” qualification · For Company who does not have CSMS, shall submit similar HSE certificate |
Having project experience within 15 years since 2002 for EPC Crude or product (premium or diesel or kerosene or avtur) or LPG or LNG Tankage Project with capacity min. 600 MB per tank.
|
Minimum 45 Million |
Minimum “40” |
Structure and requirements for each Consortium/JO set forth in PQ document.
Note :
1 Shall be proved by copy of contract and handover certificate.
2 Audited financial statement year 2017.
3 Domestic company : 100% share owned by Indonesian or Indonesia Government.
4 National company : share not fully 100% owned by Indonesian or Indonesia Government.
5 Shall be proven by copy of ownership evidence.
6 Mandatory if Leader is National or Overseas Company, Optional if Leader is Domestic Company
7 Mandatory if Leader or other member has no experience in above tankage project, Optional if leader or other member has this experience
III. PQ PROCESS STAGE
No. |
Activity |
Schedule (Tentative) |
Description |
Document Required |
1 |
Registration |
4,5,6,9 July 2018 Time: 10.00 am – 11.30 am and 1.00 pm – 3.00 pm (Jakarta Local Time) |
Performed by single company |
· All documents requested at Point II. · Copy of contract and Handover certificate of project experiences. · Audited Financial Report of 2015, 2016 and 2017. · Statement letter as required*) |
Note :
PT Pertamina (Persero) Contracting & Procurement Services - Patra Office Tower,
2nd Floor, Jl. Gatot Subroto Kav. 32-34 – Jakarta.
*) Statement letter signed by Director of the Company that stating :
Jakarta, 4th July 2018
BID COMMITTEE
MEGA PROJECT REFINERY & PETROCHEMICAL DIRECTORATE
PT PERTAMINA (Persero)